
AMPP (NACE) coatings inspection
Every coat, checked and recorded.
Coating inspection from bare steel to final coat by AMPP (NACE) Level 2 and 3 certified inspectors. Salts, profile, dew point, film thickness, adhesion and holidays, reported against your specification and ITP.
- AMPP (NACE) Level 2 & 3
- Soluble salts
- Surface profile
- Dew point
- DFT
- Adhesion
- Holiday testing
Do you need it?
A coating only lasts if the steel under it was right.
Coatings inspection checks each stage of a paint job against the specification, from the blasted steel to the final coat. Most coating failures start before the first coat goes on: salt left on the steel, too little blast profile, or paint applied too close to the dew point.
We check each layer as the job goes, so problems are caught while they’re still cheap to fix. Nothing gets painted over until it’s been checked, and your QA pack shows what was done, not just that it was signed.
- 01
Salts & dust
On the blasted steel, before anything is painted over them.
- 02
Blast profile
Measured, so the primer has something to grip.
- 03
Film thickness
On every coat, against the specified range.
- 04
Adhesion & holidays
Pull-off through the full system, and pinholes and thin spots found before hand-over.
Hold points
Nothing gets painted over until it’s been checked.
- 01
Before the job
Specification, coating system, data sheets and ITP reviewed, and hold points agreed.
- 02
Surface prep
Climate, salts, blast cleanliness, profile and dust, before the first coat.
- 03
Application
Batch numbers, mixing, stripe coats, climate and overcoat times recorded.
- 04
Each coat
Dry film thickness on every coat, checked against the specified range.
- 05
Final
Holiday and adhesion testing, visual, and the sign-off for hand-over.
The kit
Elcometer and PosiTector, calibrated and on site.
Every instrument is in date, and the salt, profile and dew point gauges are NATA calibrated. Serial numbers go on every report.
Film thickness
Elcometer 456 & PosiTector 6000
Every reading stored, with the mean, minimum and maximum for each area. Checked on certified foils.
Dew point
Elcometer 319 & DewLogger
Air and surface temperature, humidity and dew point, logged through the shift. NATA calibrated.
Soluble salts
Elcometer 138 Bresle kit
Chlorides by Bresle patch and conductivity, to ISO 8502-6 and 8502-9. NATA calibrated.
Surface profile
Elcometer 224 digital
Peak-to-valley profile read straight off the blasted steel, to AS 3894.5. NATA calibrated.
Replica tape
Testex Press-O-Film
The profile is pressed into the tape, read on a spring micrometer and kept with the report, to ISO 8503-5.
Cleanliness
Visual & dust tape
Blast standard to ISO 8501-1 and SSPC, dust to AS 3894.6 and ISO 8502-3.
Adhesion
Elcometer 510 pull-off
Pull-off to AS 3894.9 and ISO 4624, plus cross-cut and knife tests to AS 1580.408.
Holidays
Elcometer 270 & 266
Low voltage wet sponge and high voltage DC detectors, to NACE SP0188.
Built for the Top End
Painted to the weather, not the clock.
If the steel is too close to the dew point, moisture forms on it before you can see it, and the coating goes on over a damp surface. Most specifications want the steel at least 3 °C above the dew point.
In a Darwin wet season the morning dew point can sit only a few degrees under the steel. We log it through the shift, so blasting and coating start when conditions allow.
Holiday testing
Low voltage wet sponge for thinner films, and high voltage DC set to the film thickness for heavier ones. Every holiday is marked, repaired and retested.
Adhesion testing
A dolly is glued to the coating and pulled off. We report the load and where it broke: in a coat, between coats or at the steel.
What you get
Every coat, on record.
Daily inspection reports with the climate log, batch numbers and film thickness for every coat. Film builds are reported by coat with the number of readings, the minimum, maximum and mean, and whether each coat conforms.
- Daily reports
- Climate, prep, batches and DFT, coat by coat
- Hold points
- Signed off against your ITP, before the next coat
- Photos & tapes
- Replica and dust tapes kept with the report
- Non-conformances
- Raised, repaired and re-inspected
To your specification
Inspected to your spec, the data sheets and the standard methods.
We inspect to the client specification and the coating manufacturer’s data sheets, using these standards and methods.
AMPP (NACE) certified
Coating inspection by certified AMPP (formerly NACE) Level 2 and 3 coating inspectors, backed by our NDT crew for the welds under the paint.
Site, shop and offshore
From iron ore port conveyors in the Pilbara to tanks, pipelines and structural steel in the Territory: in the blast shop, on site and on rope access.
Coating to inspect at height or offshore? See rope access.
- AMPP (NACE)
- NATA 12303
- ISO 9001
- AINDT
- IRATA
Brochure
Coatings inspection
Bare steel to final coat: salts, profile, dew point, DFT, adhesion and holidays.
4 pages · PDF 0.6 MB
Get in touch
Coating going on? Get it checked.
Swift reporting, round the clock.
